Your Shopping Cart is empty.


Download sample
File Details
Published: 2025-06-22 05:32:50.240088 Category: Technology Type: Photo Model release: No
Share
       

Wide Shot of Data Center Construction with Exposed Framework and Ceiling

Contributor: Hathairat
ID : 1545666665

TitleFilesize
Photo4368x2448


Buy on Adobe Stock

Keywords
datum, center, construction, wide, shot, infrastructure, building, interior, framework, electrical, mechanical, installation, space, industrial, ceiling, lighting, completion, renovation, technology, design, project, architecture, modernization, facility, layout, empty, structure, wire, piping, environment, perspective, high technology, level, area, planning, development, future, workspace, equipment, system, safety, maintenance, detail, contemporary, surface, arrangement